5
DRAIN INSTALLATION
• Apply a bead of PUTTY to underside of FLANGE on DRAIN
BODY (1).
• Feed DRAIN BODY (1) down through lavatory.
• Assembly GASKET (2) WASHER (3) and LOCKNUT (4) onto
DRAIN BODY (1). Tighten LOCKNUT (4) firmly.
• Apply Teflon Tape to TAILPIECE (5) and thread onto DRAIN
BODY (1).
C
6
TEST INSTALLED FAUCET
• Turn HANDLE to "off" position.
• Remove AERATOR (1) using TOOL (2) supplied.
• Turn hot and cold water supplies on. Operate HANDLE to flush water lines thoroughly.
Check spout connections for leaks.
• Check all drain connections for leaks.
• Turn handle to OFF position. Replace AERATOR (1).
1
2
1
LAVATORY
2
3
4
5
PUTTY