INSTALLATION
5
Hang the next VYNE in the fixture run by repeating steps 3 and 4.
6
Attach the fixture and cable connectors.
A. Match up the keyed pins (male to female) and push it on until
you hear a "click".
B. Check that the connector is securely attached by lightly
tugging on the fixtures. The connector will not come off if
properly installed. Failure to test the cable connection may
result in electrical shock or damage to the product.
To disconnect the fixture and cable connectors:
A. Wieland RST: Use a flat head screwdriver to press on the
center release button to unlock.
B. M19: Twist the locking ring a quarter turn counter-clockwise
and pull straight out.
Repeat Steps 3 - 6 for each fixture of the run.
7
8
If installing a 2-row configuration:
A. Hook the bottom fixtures to the top fixtures via the end caps (requires 600 mm hanger part number VN-BRKT-600).
B. Connect the fixture connectors together as in installation Step 6.
Figure A. Single Circuit
C. To power the bottom row:
If the total of both rows are equal to or less than maximum permitted quantity of connected fixtures, use an accessory jumper cable (i.e.
P/N CAC-A-JP-RST1-10) to connect the top row to the bottom row on the opposite end
If the total quantity of fixtures will exceed the limit, connect the bottom row to a different branch circuit using a second AC power cable
(i.e. P/N CAC-A-IN-RST1-65)
Install an end cap at the end of each fixture run.
9
6a
(Figure
B).
M19 Connector
5
6a
Figure B. 2 Circuits
(Figure
A).
6b
"CLICK"
"CLICK"
Wieland RST Connector
5