Operating instructions
4. Operation.
4.1 - In order to place the elevator tower in
their working location, put the tower leaned in
their transport wheels (T) on a hard and level
surface.
4.2 - Get on the legs (P) of their support for the
transport (S) and insert them in their working
lodging (V) verifying that they are tightly
fastened by the safety catches (R).
4.3 - Adjust the vertical position of the tower by
means of the disc feet supports (Q) rotating
the hand crank (H) in the necessary direction
to manage that the bubble of the spirit level (F)
stays centred in the circle.
4.4 - Put the load on top of the tower using the
suitable support, in order to make work the
weight of the load only in the vertical direction.
The minimum load must be 25 Kg.
4.5 - Lifting:
Elevate the tower rotating the hand crank
of the winch (W) clockwise (N
up to desired height.
Depósito legal y Copyright 2006. Todos los derechos reservados.
), lifting the load
1
ENGLISH
4.6 - Lowering:
The manoeuvre of lowering is obtained
by the opposite way. Lift the blockade on the
safety catch (M3) and rotate the hand crank of
the winch in a counterclockwise (N
the load until that the third profile would be
completely folded.
Lift the blockade on the safety catch (M2)
and continue lowering the tower until that this
second profile would be completely folded.
Lift the blockade on the safety catch (M1) and
continue lowering the load until that the tower
would be completely folded down to its minimum
height.
The tower can be left in any intermediate
position wich would be necessary, the same as
lifting the load.
4.7 - For the transport of the tower is necessary
to fold the tower lowering completely all the
profiles, blockading them with the safety
catches (BT). Get out the legs lifting the
blockade on the catches and put them in their
transport lodging (S).
) lowering
2