Descargar Imprimir esta página

Renfert Basic master Traduccion Del Manual De Instrucciones Originale página 20

Ocultar thumbs Ver también para Basic master:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
3.4
Accessories
Abrasives
en
Cobra aluminium oxide
1594-1105
1594-1205
1594-2220
1584-1005
1583-1005
1583-1020
1587-1005
1587-1020
1585-1005
1585-1020
Rolloblast glass beads
1594-1305
1594-2312
1589-1005
Nozzles
Round nozzles
90002-1203 0�4 mm [0�0158 inch]
90003-3213 0�65 mm [0�0256 inch]
90002-1204 0�8 mm [0�0315 inch]
90003-3211 1�0 mm [0�0394 inch]
90003-3214 1�2 mm [0�0473 inch]
90002-1205 1�4 mm [0�0552 inch]
90002-1206 2�0 mm [0�0788 inch]
Slotted nozzles
90003-1739 1�5 x 3�5 mm [0�0591 x 0�1379 inch]
4
Commissioning
Risk of injury!
Loose tubes may hit objects around them.
Tubes must be connected first to the unit.
Only press the foot switch after all tubes have been connected.
4.1
Installation
⇒ Choose a stable and non-slip surface to stand the unit on�
4.2
Foot switch connection
⇒ Remove the foot switch from its shipping location in the blasting
chamber�
⇒ Insert the end of the tube marked with an „A" (20) as far as it will
go into the tube connection point also marked with an „A" (14)
on the blasting unit�
⇒ Insert the end of the tube marked with an „B" (20) as far as it will
go into the tube connection point also marked with an „B" (15)
on the blasting unit�
When inserting the tubes you will notice a slight resistance which
must be overcome�
25 µm [500 mesh], white 5 kg canister
50 µm [270 mesh], white 5 kg canister
50 µm [270 mesh], white 20 kg bucket
90 µm [170 mesh], white 5 kg canister
110 µm [150 mesh], white 5 kg canister
110 µm [150 mesh], white 20 kg bucket
125 µm [115 mesh], pink 5 kg canister
125 µm [115 mesh], pink 20 kg bucket
250 µm [60 mesh], white 5 kg canister
250 µm [60 mesh], white 20 kg bucket
50 µm [400-200 mesh] 5 kg canister
50 µm [400-200 mesh] 12�5 kg canister
100 µm [170-100 mesh] 5 kg canister
- 6 -
14
15
20
Fig. 2

Publicidad

loading