IML newBCC 300M Manual De Instalación Y Mantenimiento página 20

Bombas para equipos contra corriente
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TUBING
• The tubing connection must be stuck to the connecting pipe that is supplied along
with the pump; joints from the connecting pipes with the suction and impulsion
nozzles are of a screw-thread type and come with sealing joints to avoid water
loss. (Fig. 2).
• Impulsion tube installation is done totally perpendicularly and is well centred with
respect to the nozzle to be connected so as to avoid external pressure being
exerted on the pump and the tube. Apart from making assembly more difficult,
this pressure could even break them. (Fig. 2)
• Suction tube installation is done at a slight angle of 2 % towards the pump, thus
avoiding siphon formation. (Fig.2).
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Newbcc 300tNewbcc 400tNewbcc 550t

Tabla de contenido