PGM at 12:00 noon, and you chose a "+6" delay, the first
irrigation start time would occur at 6:00 p.m.
Turn the programming dial to the desired setting and wait at least
10 seconds.
CAUTION: If you choose no delay (+0), watering will start seven
seconds after you set the start time.
Select Calendar and Cycle
D
This setting is the number of hours in a watering cycle and the
number of waterings per cycle. In the purple section of the label,
you can choose a daily watering cycle (24 hours), every other day
(48 hours), or every third day (72 hours).
You can choose one (1X) or two (2X) waterings per cycle. For
example, the setting "2X72" will water twice on every third day.
NOTE: Selecting a 2X cycle results in two waterings with a 4-hour
soak time in between. For example, if you set a 10-minute run time
and a 2X48 calendar cycle, the sprinklers will run as follows:
Day 1
Run for 10 minutes
Shut off for 4 hours
Run for 10 minutes
1. Put the cycle indicator on the desired setting in the purple
section of the label.
2. Turn the programming dial to the desired setting and wait at
least 10 seconds.
Easy Rain™
Day 2
No watering
Day 3
Same as Day 1
3