Installation
1
Preparing for installation
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
□
Shut off the water supply.
□
Verify that the hole sizes and positions of the
holes in the wall are correct:
□
The shower outlet holes should be 1-1/4 in.
diameter.
□
Refer to Step 2 for valve access hole
dimensions.
□
The recommended valve depth to the
nished wall is 2 in. min. to 3 in. max.
□
Ensure that the valve body (D) cover is ush
with the nished exterior surface of the wall.
Position the valve body (D) correctly in the
wall with the side marked "UP" pointing up.
1 1/4" Dia
30"
Refer to
the step 2
D
48"
2
Installing the valve body
□
The plaster guard (J) is positioned so that it is
ush with the nished wall. This ensures that
the valve will be at the correct position to accept
the trim. The depth for the valve body (D) in wall
is measured from the center of the shower
outlet to the nished wall surface. The accepted
depth distance is 2 in. to 3 in..
NOTE: Be sure to position the valve body (D) correctly in
the wall, with the side marked "UP" facing upward.
Finished wall
7
Please contact 1-855-HD-GLACIER for further assistance.
2 in. to 3 in.
D
J
HOMEDEPOT.COM/GLACIERBAY