Descargar Imprimir esta página

Craftsman 139.30437 Manual Del Propietário página 13

Ocultar thumbs Ver también para 139.30437:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall above the
garage door, or to the ceiling. Follow the instructions which will
work best for your particular requirements. Do not install the
header bracket over drywall. If installing into masonry, use
concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
1. Center the bracket on the vertical centerline with the bottom
edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling) (Figure 1).
2. Mark the vertical set of bracket holes. Drill 3/16" pilot holes
and fasten the bracket securely to a structural support with the
hardware provided.
CEILING HEADER BRACKET INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown
(Figure 2).
2. Center the bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the
ceiling when clearance is minimal.
3. Mark the side holes. Drill 3/16" pilot holes and fasten bracket
securely to a structural support with the hardware provided.
HARDWARE SHOWN ACTUAL SIZE
Figure 1
Optional
Mounting Holes
2x4
Structural
Support
Horizontal
Line
Highest Point of
Garage Door Travel
Ceiling Mounting Holes
Figure 2
Header
Bracket
6" (15 cm) Maximum
Door
Spring
Garage Door
13
Lag Screw
5/16"-9x1-5/8"
Wall Mount
UP
Vertical
Centerline
of Garage Door
Header
Bracket
Door Spring
Vertical
Centerline
of Garage Door
UP
Vertical Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Vertical
Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"

Publicidad