Descargar Imprimir esta página

Toro 98-9230 Instrucciones De Instalación página 9

Kit de conversión gts 200

Publicidad

Idiomas disponibles

Idiomas disponibles

2.
Remove and discard old control panel decal.
Install new control panel decal (Fig. 15).
3.
Install new throttle control using (4) Phillips
head screws and (4) lock nuts previously
removed. Install new throttle control retainer.
Note:
Make sure seal on throttle cable is
pushed down tight.
4.
Connect throttle cable to throttle arm on engine.
5.
Move throttle to
(FAST) position.
6.
Push throttle arm to rear of engine as far as it
will go.
7.
Install new cable clamp and cable clamp screw
to engine (Fig. 14). Tighten cable clamp screw to
lock throttle cable in place.
Install New Control Bar
(BBC Models Only)
1.
Remove handle screw, support spacer and hex
flange nut securing right side of control bar to
handle (Fig. 16). Retain these items for
reinstallation.
2.
Carefully remove hex head cap screw, spacer and
lock nut securing left side of control bar and top
portion of control bracket to handle (Fig. 16).
Retain these items for reinstallation. Leave other
parts loosely assembled in control bracket for
reinstallation.
3.
Remove and discard old control bar.
4.
Attach new control bar by reversing order of
disassembly.
Figure 16
1. Control bar
2. Handle screw
3. Support spacer
4. Hex flange nut
Reinstall Gas Tank
Reinstall gas tank in reverse order of disassembly
(Fig. 2). Connect fuel line to engine.
Installation
5. Hex head cap screw
6. Spacer
7. Lock nut
8. Control bracket
EN–9

Publicidad

loading

Este manual también es adecuado para:

98-9240