PARTS
1.
Temperature control knob
2.
Freezer drawers
3.
Levelling feet
4.
Handle
BEFORE THE FIRST USE
·
Remove the exterior and interior packing, wipe the outside thoroughly with a soft dry cloth and the
inside with a wet, lukewarm cloth.
·
Avoid direct sunlight and heat. Direct sunlight may affect the acrylic coating. Heat sources nearby will
cause higher electricity consumption.
·
Avoid very moist places.
·
Before connecting your refrigerator to the power supply, check that the voltage stated on the rating
label of your appliance corresponds to the voltage in your home. A different voltage could damage the
appliance.
·
Make sure that you have access to the plug of the appliance.
·
Make sure that the air can circulate around the freezer.
·
For uneven surfaces, front feet can be aligned.
·
Install the handle.
·
Allow the appliance to stand for 2 hours before turning it on. This allows the cooling agent to settle.
·
After installation, let the freezer turned on for 6 hours before using it. This way the desired
temperature can be reached.
www.domo-elektro.be
1
2
16
3
4
33
DO937DV