Descargar Imprimir esta página

golmar 295 Serie Manual De Instalación página 36

Ocultar thumbs Ver también para 295 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

DOOR PANEL INSTALLATION
Pass the wiring through the hole made in the bottom part
of the embedding box. Level and flush the embedding
box. Once the embedding box is placed, remove the
protective labels from the attaching door panel holes.
Insert the hinge in the embedding box lockers.
Press the hinge ends to insert them in the door panel
lockers as shown.
Open the terminal connector cover and connect
the wires as shown on the installation diagram.
In case of door panels with more than one module
link the main module with the push buttons modules
through the UC junctions and wire them as shown
on the following page.
68
P
lace the embedding box.
H
old the door panel on the embedding box.
D
oor panel wiring.
69
DOOR PANEL INSTALLATION
The maximum number of push buttons modules contained in a door panel
is two, obtaining a maximum of 24 push buttons.
Wire the push buttons modules with the main module as shown below.
Main module
1st push buttons module
PE4-295 or PV-295
CN2
L1 L2 CD1
CD2 CP
L1 L2
Each push button has a digital code assigned in it, that will be recorded
on the corresponding monitor (telephone) during the recording progress.
In case to combine these door panels with "Stadio Plus" door panels or
with PV-295/CODE or PE4-295/CODE general entrance door panels,
it will be necessary to know these codes for a properly system configuration.
Main module
1st push buttons module
PE4-295 or PV-295
8
7
6
5
4
3
2
1
L
inking the push buttons modules.
2nd push buttons module
CD-295
CD-295
CN1
CN1
CP CD
L1 L2
CP CD
P
ush buttons digital code.
2nd push buttons module
CD-295
CD-295
16
24
15
23
14
22
13
21
12
20
11
19
10
18
9
17

Publicidad

loading