Descargar Imprimir esta página

Hitachi PSC-5S Manual De Instalación Y Funcionamiento página 17

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
INITIALIZATION OF CENTRAL STATION
Setting Procedure
1. Depress the "CHECK" switch and select the setting item A – E.
2. Select the group to be set by depressing the "GROUP" switch.
3. Depress the "RUN/STOP" switch, the option setting is done. At that time, the " " indication
appears and the "SET" indication also appear. (Every time the "RUN/STOP" switch is
depressed, the optional function is set and canceled alternately.)
CAUTION:
- In case that the optional functions are set by the central station, it is required to set the same
optional functions for the group by the remote control switch.
- In case that the optional functions (items A – E as shown above) are set by the remote control
switch, it is required to set the same optional functions for the group by the central station.
7.
INITIALIZATION OF CENTRAL STATION
The procedure for initialization of the group setting and the optional setting is as follows.
1. Changing to Self Check Mode
Depress the "GROUP(
and
changed to the self check mode. In case that there is a group in operation, the "NO FUNCTION"
is indicated and the central station can not be changed to the self check mode.
After changing to the self check mode, the LCD indication is changed from (I) to (vi) as shown
below.
Before the indication is changed to (vi), depress the "GROUP(
simultaneously again, and the central station is changed to the initializing mode.
(i)
(iii)
NOTE:
In case that the "GROUP (
self check operation continues.
)" and "MODE" switches simultaneously, the central station is
and
(ii)
(iv)
and
)" and "MODE" switches are not depressed again, the
/
7
13
)" and "MODE" switches
(v)
All Indications
: OFF
(vi)
All Indications
: ON

Publicidad

loading