/
OPERATION PROCEDURE
9
16
9.
OPERATION PROCEDURE
Group Selection and Monitoring Unit Operation Status
The central station can control up to 16 groups by each group or simultaneously.
(The selected groups can be operated and the unit operation status of the groups can be
monitored.)
NOTE:
The group number is changed by depressing the "GROUP" switch. The group without group
setting is not indicated.
1. Supply power to the unit.
ATTENTION:
- Supply power to the unit more than 12 hours before
unit operation for compressor protection.
- Do not cut off power during the term of using air
conditioner.
2. Depress the "GROUP" switch.
Every time the "GROUP" switch is depressed, the group
number to be controlled is changed in the order as shown
below. In case of "AA", all the units are controlled
simultaneously.
3. When selecting the group, the setting conditions of
each group are indicated.
By operating by the remote control switch, the content of
the setting is indicated.
1 ~16
Show the operating conditions of each group as
follows;
- Turned OFF ( ): Stop
- Turned ON ( ): Operation
- Flickering (
): Abnormality
The Run indicator (Red Lamp) shows the following:
- Turned OFF: All Groups Stop
- Turned ON: More than 1 Group in Operation
- Flickering: More than 1 Group in Abnormal Condition.
NOTE:
The indication of setting temperature "- -" shows no setting of temperature.
Group No. is changed.
(ex. In case of selecting group 3)
Only Group Numbers Already Set are
indicated.
Operating Conditions of Each Group
(ex. In case of "COOL", "MED" and
"28°C")
Operating Conditions of Each Group
(ex. In case of groups 1 ~ 3 in
operation)
In case of group AA, the indications
(operation mode, setting temperature,
ail flow, louver angle and "RMT. SW
NAVAL") are indicated only when all
groups are in the same setting.