Select the required work mode according to section 4.5
c.
and configure it.
Zero injection (optional)
6.
In order to enable zero injection, you must enable the
a.
Export Limit switch parameter and set the Feed in grid
setting parameter to 0.0% (only for General mode and
Economy mode).
USER MANUAL
PeakLoad Shifting (Optional).
7.
In order to enable the peak consumption mode, you must
a.
Peakload Shifting
enable the
imum power with the
Grid capacity limitation
(only for General mode).
parameter and set a max-
parameter
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
85