Installation - Tecno-gaz ANDROMEDA PLUS xp Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PAR. 5
The installation is a fundamental operation for the following use and good operation of the device.
Here is a list of the points to be followed in order to achieve a good installation.
1. The device must be installed inside a laboratory accessible only to authorised personnel.
2. The room in which autoclave is installed must be lighted in according to standard UNI ISO 10380.
3. Position the device on a plane surface with minimum capacity 60 Kg.
4. Make sure that the sterilisation chamber is slightly tilted towards the bottom.
5. Leave at least 10 cm between the device rear part and the wall.
6. Position the autoclave at such a height as to make it possible for the operator to check the whole
sterilisation chamber and carry out the normal cleaning operations.
7. The room where the device is installed must be enough ventilated.
8. Do not install the autoclave near washing basins, taps, because the device furniture is not waterproof.
9. Do not place trays, papers, fluid containers, etc. on the device, because the device grids are used to
ventilate must not be obstructed.
10. Do not lean on the door when it is opened.
11. Do not install the device near sources (for instance: autoclave, bunsen, burner and kiln); keep a
minimum distance of 40 cm.
12. Install the device in such a way as not excessively bend the supplying cable.
13. In case the filling tank is directly discharged in waste waters, position the device at a height which is
higher than the discharge.
14. When the autoclave is embedded it is necessary to follow these instructions:
lug the rilsan pipe supplied with the autoclave in the connector located on the rear part.
Discharge by gravity the other extremity of the pipe in an open container, to allow the discharge of the
steam. THE PIPE MUST NEVER GET IN TOUCH WITH THE WATER INSIDE THE CONDENSE
CONTAINER.
15. Make sure that the electrical system to which the device is connected is produced according to the laws
in force and has the suitable dimension for the device features; see PAR.2 of this manual.
16. Connect the device pin to a socket which complies with the data reported in PAR.2, of this manual or the
device identification plate.
17. Never connect the device pin to reductions of any type.
18. Load the filling tank as explained on PAR.8, of this manual.
19. After the installation, carry out a LOADED sterilisation cycle as explained on PAR.11, of this manual.

INSTALLATION

19
DPTA208 Rev_2

Publicidad

Tabla de contenido
loading

Tabla de contenido