1.Preparatory work:
A. Make sure there is enough space before installation;
B. Confirm all of the components are all-ready before installation. ( refer to previous product
exploded view which indicates the name and the location of the components);
C. Use the provided tools or the special self-contained tools to install。
2. Assembly instructions:
Step 1:
Screw Front and Rear Stabilizer (4&1) on Main Frame (59) with Screw (3), Washer (6) and Nut (7).
Assembly Instructions
6