Descargar Imprimir esta página

coralwai ZEYA Manual Del Usuario página 27

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION METHOD
INSTALLATION AND COMMISSIONING OF THE PRODUCT:
The product must be installed by a qualified professional. Before installing, please
confirm whether the accessories in the package are sufficient and complete. The list
of package contents can be found in the manual.
1. Environmental requirements for installation
1.1 The product is to be installed on your own tap water pipe connection.
1.2 There must be a 220 V~ power socket.
1.3 The installation place for the product must be clean and hygienic, free of
surrounding pollution, out of direct sunlight; away from flammable, explosive and
electrical equipment in the vicinity and sheltered from rain.
NOTE
Please pay attention to personal safety when using drilling tools. The drilling site must
be free of water, electricity, gas and hidden pipes.
2. Installation of electrical circuits
2.1 It must be installed by qualified professional personnel.
2.2 Tools and materials for the installation: Multimeter, test pen, cable, insulating
tape, plug plate, expansion pin, threaded screw, etc.
2.3 Close the main switch of the power supply, carefully modify it according to user
requirements and perform standard operation in accordance with the operating
rules of the electrical installation in the process of operation.
2.4 After modification, check the circuit and clean the surroundings of the installation.
3. Installation connection of the output quick-fit connector
The water outlet of the product has a quick-connect port. The quick-fit connector is
a connector that can be connected quickly and firmly without the need for tools. By
pressing the movable plastic ring on the surface of the port, it can be easily fixed to
the port. Unplug the plastic cap or PE tube and insert the PE tube into the connector
port. When it is necessary to remove the water outlet quick-fit connector from the
PE pipe, pull the plastic ring on the port surface towards the port so that it can be
attached to the port and the PE pipe can easily be removed.
27
EN

Publicidad

loading

Productos relacionados para coralwai ZEYA