We value your experience using Sunny Health and Fitness products. For assistance with parts or
troubleshooting, please contact us at support@sunnyhealthfitness.com or 1-877-90SUNNY
(877-907- 8669).
STEP 2
NOTE: Make sure the Tension
Controller (No. 28a) is at the lowest
level before you connect the cable.
This ensures the cables are at their
longest point. We recommend the
assistance of a second person to help
hold the Handlebar Post (No. 2). This
will make the connection easier when
you are attaching Tension Hook (No.
20) to the Tension Cable (No. 28b).
Attach the Tension Cable (No. 28b)
into the lower metal bracket of
Tension Hook (No. 20) as shown in
Diagram G-1. Then pull Tension
Cable (No. 28b) upward and insert it
into the slot on the upper metal
bracket of Tension Hook (No. 20) as
shown in Diagram G-3. Make sure the
metal fitting on the Tension Cable
(No. 28b) is secured in the metal
bracket.
Connect the Sensor Wire (No. 21) to
the Sensor Extension Wire (No. 22).
Insert the Handlebar Post (No. 2) into
the post of the Main Frame (No. 1),
secure with 4 Arc Washers (No. 14),
4 Spring Washers (No. 55) and 4
Screws (No. 27). Tighten and secure
with Allen Wrench (No. 87).
NOTE: Do not cut or pinch any wires
when attaching the Handlebar Post
(No. 2). Ensure that all bolts and
washers are in place and partially
threaded in before completely
tightening any of them.
5