Descargar Imprimir esta página

Broan CST80KW Instrucciones De Instalación página 4

Ventilador de bano con control mural con sensor de humedad

Publicidad

Idiomas disponibles

Idiomas disponibles

Mount fan to ceiling
1 7
structure.
Mount housing to ceiling
structure with appropriate
fasteners in locations shown.
Connect 4-in. round duct.
1 8

Pull existing ducting through
housing discharge opening and
tape ducting using aluminum
ƒ
foil tape.
Push connector/
ducting back through opening.
Engage tabs and
screw from parts bag.
Install blower.
1 9
Re-install blower removed
in Step 1. Secure blower
with 2 screws from parts
bag. Plug blower into black
receptacle.
Install grille.
10
1
Squeeze grille
springs and
insert into slots in
blower. Push grille
up against ceiling.
3
2
secure with
ALL INSTALLATIONS
1
2
1
4
TABS
4
Continue with Step 9.
1
2
1114204A

Publicidad

loading