Descargar Imprimir esta página

Monogram Z2V830 Instrucciones De Instalación página 8

Campana de ventilacion de chimenea de 30' (76,2 cm)

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Preparation
CHECK INSTALLATION HARDWARE
Locate the hardware package packed with the hood and check contents.
HARDWARE PACKAGE
Locate and count
screws
_
ed
Air deflector for
"WV
recirculating
installation only
and air deflector
screws
.
(#8 thread
13-1/4" —
forming screw
a
6 wood
4 wall
3/8" long)
screws
fasteners
(#10 1-3/4" long)
(5/167)
2-piece decorative duct
25-1/8"
cover (dimension shown
|
for reference only)
REAR WALL
—_
MOUNTING TEMPLATE
Installation Height
Installation Height
Align Bottom Edge With
Align Bottom Edge With
Pencil Line Indicating
Pencil Line Indicating
Bottom of Hood
Bottom of Hood
Wall mount template
Stainless steel filter
1 charcoal filter for
recirculating installation

Publicidad

loading