Descargar Imprimir esta página

Zoeller QWIK DRAIN 105-0032 Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 1
NOTE: External plumbing configuration
will vary depending on the
location of basin, location of
main stack and available space.
Place the basin assembly in its final
position and complete plumbing.
-
-
-
-
STEP 2
1. Plug the cord into a properly grounded GFCI receptacle.
2. Slowly fill the basin with water and check all internal plumbing for leaks as basin fills.
3. Verify that the pump starts and stops.
4. Confirm the discharge line, check valve, & coupling do not leak as pump empties basin.
5. Repeat steps 2 through 4 as necessary to ensure proper operation.
6. If problems persist, refer to the service checklist located on page 2 of this manual.
MODELS
ITEM
DESCRIPTION
1
Replacement Pump - 3/10 Hp
2
Replacement Pump - 1/3 Hp
3
Fitting Kit - 105 Qwik Drain
4
Seal Kit - Qwik Drain Pro
5
Seal Kit - Qwik Drain
Final Assembly
-
-
-
SK3396
Initial Testing of Drain Basin System
Illustrated Parts Breakdown
105-0031
01/24 thru
QTY
current
1
53-0001
1
N/A
1
158357
1
158358
1
N/A
© Copyright 2024 Zoeller
105-0032
01/24 thru
current
N/A
73-0001
158357
N/A
158359
Co. All rights reserved.
®
4
SK3397
SK3397

Publicidad

loading

Este manual también es adecuado para:

Qwik drain pro 105-0031