Installation Procedure - Toto YT830 Manual De Instrucciones Y Del Propietrario

Placa de empuje redonda
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1) Use a bucket to drain the water
supply line from any debris. Let the
water runs for a minute.
2) Connect the hose to the fill valve
and turn on the water supply valve.
Check for any leaks.
3) Place the actuator in the tank front
opening as shown above. Ensure
that the top and rear tabs along
the top edge hook into top edge
of the front tank opening.
4) Make sure the hooks of the actuator
go into the fill valve handles. Then
secure the actuator by turning the 2
gray knobs clockwise by half turn.
5) Adjust the threaded studs
indicated above (top left
& bottom right) to 3/8"
[10mm] from the wall
surface.
6) If the wall thickness is less than
1-½" [38mm], break the connecting
rods (both red & blue) at point B.

INSTALLATION PROCEDURE

4
"
[1
0
m
m]
A
B
C
Wall thickness
- 1
½
"
3 [
8
m
m
]
B

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido