Descargar Imprimir esta página

Haier MRV 5 MVHQ072ME2CA1 Manual Del Propietario Y Instrucciones De Instalación página 12

Sistema de bomba de calor y recuperación de calor

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
Dimensions and Service Clearances
Space requirement for installation
• There should be no obstacles within 78.7 in. (2000mm) above the top of the outdoor unit.
• Keep the area from the base to 36 in. clear of any obstacles.
• Multiple outdoor units should be installed in order of size so that the smallest unit is farthest away from the first piping
branch fitting.
1. Single Installation
2. Combinations installation
Unit can be installed in the same or opposite direction.
12
>78-3/4in.
Air outlet
>35-13/32in.
>11-13/16 in.
>7-29/32 in.
>7-29/32 in.
>11-13/16 in.
Back
>11-13/16in.
Left
Front
>39-13/32in.
>11-13/16 in.
>39-13/32 in.
>11-13/16 in.
>39-13/32 in.
49-5000878 Rev. 0

Publicidad

loading