Descargar Imprimir esta página

Haier MRV 5 MVHQ072ME2CA1 Manual Del Propietario Y Instrucciones De Instalación página 18

Sistema de bomba de calor y recuperación de calor

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
Pipe Specification
2. Pipe "B" diameter (between branch pipe)
Total indoor capacity after the branch pipe KBtu/h (kW)
X < 57.3 (< 16.8)
NOTE: Adjust the diameter on field (changing pipe is needed)
3. Pipe "C" diameter (between VP and branch pipe, depends on VP pipe)
VP
Suction gas pipe in(mm)
112B
180B
280B
4. Pipe "D" diameter (between VP branch pipes)
Total indoor capacity before gather
pipe KBtu/h (kW)
X < 57.3 (< 16.8kW)
18
(cont.)
HP gas pipe in(mm)
Suction gas pipe in(mm)
Gas pipe in(mm)
Liquid pipe in(mm)
Liquid pipe in(mm)
HP gas pipe in(mm)
Liquid pipe in(mm)
49-5000878 Rev. 0

Publicidad

loading