Mechanical installation
Installing the refractometer
Plan the installation location carefully before installation. See
(page
10).
Standard installation:
• Welding equipment
• Refractometer
• Ferrule
• Gasket
• Clamp
High pressure installation:
• Welding equipment
• 9/16 in wrench (for high pressure clamps)
• Refractometer
• Ferrule
• Gasket
• Clamp
These are general instructions for the refractometer mounting. Plan the process‑specific
installation according to your requirements. Contact Vaisala helpdesk for further assistance if
needed.
If you are using a flow cell, see
1. Familiarize yourself with the installation site safety instructions.
2. Make sure the process line is depressurized.
Installing refractometer with flow cell (page
Choosing the installation location
15).
13