Finalizing Installation - Vaisala PR53AC Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 91

Finalizing installation

• Check that the pipe connections are tightened properly.
• Check that there are no leaks in the process.
• Check that the piping is firmly in place and there is no excessive vibration.
See
PR53 Series User Guide (M212898EN)
for further instructions on startup and calibration.
25

Publicidad

Tabla de contenido
loading

Tabla de contenido