Descargar Imprimir esta página

MEGABRAS HP-80KV Manual De Uso página 26

Hipot cc hasta 80.000 v

Publicidad

Idiomas disponibles

Idiomas disponibles

9.3. Ramp test
In this fully automatic mode the operator will indicate max current, the
max. voltage, dwell time, ramp up ratio and ramp down ratio.
To configure these parameters follow the instructions below:
• Access the device's MENU using the
• Use the control
• Use the control
Maximum current
9.3.1.
(See 9.1.1, pg. 24)
Test voltage
9.3.2.
(See 9.2.2, pg. 26)
Dwell time
9.3.3.
(See 9.2.3, pg. 26)
Ramp up
9.3.4.
• Use the control
, to select SETUP TEST and press
SETUP TEST
LANGUAGE
SETTINGS
, to select RAMP and press
, to select RAMP UP and press
27
HP
button.
.
.
.
80KV

Publicidad

loading