Descargar Imprimir esta página

Ferroli BlueHelix ALPHA C Instrucciones De Uso, Instalación Y Mantenimiento página 281

Ocultar thumbs Ver también para BlueHelix ALPHA C:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

BlueHelix ALPHA C
To open the boiler casing:
1. Undo the screws "1" (see fig. 47).
2. Pull the panel outwards and lift it.
On this unit, the casing also acts as a sealed chamber.
B
After any operation involving opening the boiler, care-
fully check the correct refitting of the front panel and
its seal.
Proceed in reverse order to refit the front panel. Make sure it is correctly hooked to the upper fas-
tenings and is correctly positioned at the sides. Once the screw "1" is tightened, the head must
not be below the lower reference fold (see fig. 48).
1
OK
EN
1
fig. 47- Front panel opening
1
fig. 48- Correct position of front panel
cod. 3540000021 - Rev. 00 - 02/2024
3
2
1
NO
281

Publicidad

loading

Este manual también es adecuado para:

Bluehelix alpha