EN
HAND DRYER JET SMART
2- Fix to wall by means of screws provided. It is essential for the correct work of
the device that it is properly aligned; it is therefore advisable to use the bubble
level included on the support fixed to wall. Installation height must be as follows:
RECOMMENDED MOUNTING
1 m
HEIGHT OF HAND DRYER
Z=90 cm
Z=85 cm
* Z shows required distance from floor to
the centre of hole of the metallic support
to fix hand dryer to wall.
Screws for wall fixing. It is recommended to
use screws and wall plugs in all 5 fixing
holes.
3- Start up the hand dryer by connecting it to power supply.
4- If when you are operating the hand dryer for the first time, you notice that the
sensors do not detect hands properly, it will be necessary to calibrate sensors
again. This can be done by removing front cover. To disassemble front cover,
remove two screws at the bottom, and slide it vertically upwards, where you will
find main switch of the device. The switch will be set in "ON
position" when the device is delivered.
Slide cover
upwards to
remove it
OFF
ON
Screw to fix
front cover
Screw to fix
front cover
Pag.8