Descargar Imprimir esta página

Motorola IMPRES PMPN4527 Guia Del Usuario página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 115
MN007272A01-AC
Chapter 1: IMPRES 2 Batteries and Chargers
Status
Fault
Standby
End of Service Life
Recalibration
1.3
IMPRES Battery Initialization
For a full IMPRES functionality, a new IMPRES battery must be initialized by the charger.
The charger automatically detects the new IMPRES battery, and automatically starts initialization. Initialization
is the first calibration and reconditioning of an IMPRES battery.
Phases of Battery Initialization
The first phase is a battery discharge, indicated by a steady amber LED. The second phase is a full charge,
indicated by a steady green LED. Refer to
NOTE: This process may take up to 12 hours or more to complete, depending on the state of charge
and capacity of the battery. Interruption of either phase delays initialization until the next charging
opportunity.
1.4
Automatic IMPRES Calibration and Recondition
The IMPRES charger automatically assesses the condition of an IMPRES battery.
Based on the condition, the charger automatically calibrates and reconditions the battery. This process starts
with battery discharge, indicated by a steady amber LED status. Calibration and recondition are complete
only after a full charge, indicated by a steady green LED status. See
page
9.
This process can take up to 12 hours or more to complete, depending on the charging status and battery
capacity. Interruption of either the discharge phase or the full charge phase delays calibration until the next
charging opportunity.
10
LED Indicator
Blinking Red
Blinking Amber
Alternating red and green
Alternating amber and green
IMPRES Battery Charging Indicators on page
Description
Not chargeable; remove and re-
insert radio or battery.
Battery is waiting to rapid
charge.
Battery may be too hot, too
cold, or low voltage.
Charger may be too hot.
Battery remains usable but may
be nearing the end of its rated
service life.
Battery requires calibration or
battery is due for calibration.
9.
IMPRES Battery Charging Indicators on

Publicidad

loading