Descargar Imprimir esta página

Celexon Professional eAdjust-58123 Manual De Instrucciones página 18

Escritorio eléctrico de altra regulable

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
STEP 6: CABLE MANAGEMENT INSTALLATION
Method 2
If the support strut is extended over 172 cm, the cable management system
must be mounted centrally on the strut.
CONTROL PANEL
KEY ASSIGNMENT
= Up
= Down
1 = Memory location 1, here the user can save the first desired height
2 = Memory location 2, here the user can store the second desired height
3 = Memory location 3, here the user can store the third desired height
M = Save button
A = Alarm
LED Display
Install the cable management plate
(3) as explained in step 6 Method 1.
Attention
The strut brace may only be pulled
out so far that the inner strut can
still be seen through the holes.
6

Publicidad

loading