Descargar Imprimir esta página

Glacier bay 8654252HC-GBBN Guía De Instalación Y Cuidado página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation
PLANNING INSTALLATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package and hardware contents list. If any part
is missing or damaged, do not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 15 minutes
Installation may vary depending on how the previous showerhead was installed. Supplies necessary for the installation of the showerhead
are not all included; however, they are available wherever plumbing supplies are sold.
Prior to beginning installation, turn off the hot or cold water lines, then turn on the old showerhead to release built-up pressure. When
installing the new showerhead, turn the connector nuts finger tight. Wrap all threaded connections with PTFE pipe tape. Always wrap in a
clockwise direction.
SPECIFICATIONS
Maximum flow rate: 1.8 GPM (6.81 LPM) at 80 PSI
cUPC, WaterSense
Brushed nickel and matte black finishes
TOOLS REQUIRED
Adjustable
wrench
Electric
drill
HARDWARE INCLUDED
NOTE: Hardware not shown to actual size.
Part
Description
AA
Rubber washer
BB
Mounting screw
CC
Wall anchor
DD
Thread seal tape
AA
BB
Safety goggles
Phillips
screwdriver
CC
Quantity
4
2
2
2
3
Please contact 1-855-HD-GLACIER for further assistance.
Channel-lock
pliers
DD
HOMEDEPOT.COM/GLACIERBAY

Publicidad

loading

Este manual también es adecuado para:

8654252hc-gbmb1003 610 3161009 462 969