English
Bosch Power Tec GmbH
Solar key or hand operated
6.3
Starting up the string inverter using
the e.Key
Prerequisites
Obtain an e.Key from the manufacturer: Pre-
programmed RFID card, which contains the
language, country and standard settings for the
respective location
Service switch is in position 1 and AC cabling is in
place
The e.Keys can be obtained in the Standard and
Premium variants. Both the standard card and the
premium card enable simplified commissioning.
▶
Procedure
1. Hold the e.Key next to the specified point on the
inverter, depending on the device category
(approx. 3 seconds).
6.2:
Position of the e.Key on the device (single-phase:
BPT-S 3-4.6)
Bosch BPT-S 3 / 3.68 / 4 / 4.6 | Operating manual
Commissioning | 85