Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7

INSTALLATION

Install the base plate
Assemble the equipment
Position the arm
1 Prepare a cement base, inserting ducts for electrical
cables.
2 Insert the base plate in the wet cement, ensuring it
is horizontal and level.
1 Once the cement base has set, place the unit (1) on
the base (2) and secure using the nuts (3).
1 Open the cover (1).
When the cover is open, the safety device prevents
motorised operation.
2 Use the crank (2) to place the support (3) in
horizontal position.
3 Secure the arm (4) using the flange (5) and the
corresponding screws and washers.
INSTALLATION
35
KUBAR Barriers

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kubar 6Kubar 8Kubar 3 pacmKubar 4 pacm

Tabla de contenido