Descargar Imprimir esta página

GE SCA1000 Instrucciones De Instalación página 14

Horno para colocar encima de la estufa
Ocultar thumbs Ver también para SCA1000:

Publicidad

Idiomas disponibles

Idiomas disponibles

MOUNT THE OVEN
A4.
Cabinet Front
Cabinet Bottom Shelf
Oven Top
4 Attach the oven to the top cabinet.
Insert 2 self-aligning screws
5
through outer top cabinet
holes. Turn two full turns on
each screw.
Tighten the outer two screws to the top of the oven.
7
(While tightening screws, hold the oven in place
against the wall and the top cabinet.)
Install grease filters. See the Owner's Manual
8
packed with the oven.
Installation Instructions
(continued)
Filler Block
Equivalent to
Depth
of Cabinet
Recess
Self-Aligning Screw
Tighten center
6
screw completely.
14
A5.
ADJUST THE EXHAUST
ADAPTOR
Open the top cabinet and adjust the exhaust adaptor
to connect to the house duct.
A6.
CONNECTING DUCTWORK
Extend the house duct down to connect to
1
the exhaust adaptor.
Seal exhaust duct joints using duct tape.
2
Damper
Back of
House Duct
Oven

Publicidad

loading