Installation instructions - Audi A3 2013 ► Audi A3 2014 ► Electrics set for removable tow-
ing bracket, scope of delivery 8V0.055.204.A Audi Genuine Accessories
Edition 03/2014
◆ The lower left-hand section of the A-pillar trim has been re-
⇒ P age
moved
34.
◆ A3: The left-hand sill panel trim has been removed
⇒ P age
32.
◆ A3: The left-hand side trim has been removed
◆ A3 Sportback: The lower left-hand section of the B-pillar trim
⇒ P age
has been removed
◆ A3 Sportback: The left-hand wheel housing trim has been
⇒ P age
removed
41.
◆ Front left-hand knee airbag has been removed
Installation
– Route the retrofit wiring harness -2- along the standard wir-
ing harness to the trailer detector control unit -J345- and
connect to the trailer detector control unit -J345- -3-.
– Establish the earth connection -1-.
– Secure the retrofit wiring harness -2- to the standard wiring
harness using cable ties.
The wires must be secured with cable ties to stop them from
"slipping" or "wearing".
– Route the retrofit wiring harness -2- along the standard wir-
ing harness to the relay and fuse carrier behind the storage
compartment on the driver side (left-hand drive vehicles) or
the glove box (right-hand drive vehicles).
– Secure the retrofit wiring harness -2- to the standard wiring
harness using cable ties.
Notes on further installation
WARNING
DO NOT connect the battery!
The battery is reconnected ONCE ALL WORK HAS BEEN
COMPLETED.
Earth point tightening torque: 9 Nm
50
6 Electrical connection
⇒ P age
37.
⇒ P age
39.
42.