EN
Triphase 220-240V~3P
Put a bridge between terminal L2 and L3 and between N1 and N2.
Attach the earth to the terminal "earth", the Phase L1 to the terminals L1, the Phase L2 to the
terminal L2 or L3 and the Phase L3 to the terminals N1 or N2.
Ensure that the cables are correctly inserted and tightly screwed down.
4 weeks after installation, be sure to tighten again the screws in the terminal block.
We cannot be held responsible for any incident resulting from incorrect connection or
which could arise from the use of an appliance which has not been earthed or has been
equipped with a faulty earth connection.
143