Descargar Imprimir esta página

Gardena AquaContour automatic Instrucciones Breves página 3

Ocultar thumbs Ver también para AquaContour automatic:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 8
1559-29.965.03_06.05.2019_GARDENA.qxp 06.05.2019 13:26 Seite 3
AquaContour automatic Art. 1559 / 8133
1
Quick-reference operating instructions
1. Position sprinkler and connect to water supply.
Art. 1559 : open cover.
2. Fit orange covering cap provided onto head of sprinkler head (see illustration).
Short-range sprinkling is thus prevented and you do not accidentally get wet when
programming.
3. Roughly set sprinkling sector via red adjusting rings.
4. Open water supply.
5. Carry out trial run and adjust sprinkling sector if necessary.
6. Select red Set LED with Menu button.
Art. 8133 : select program 1 or 2.
7. The sprinkler must be completely extended. If necessary, press + button at least once
so that the sprinkler head extends fully.
8. Align nozzle head by hand with the first / next irrigation point and hold.
9. Adjust the sprinkling distance with the + / - buttons and confirm with the OK button.
10. Programming of further sprinkling points : repeat from step 8 onwards.
11. After programming all sprinkling points, select green Auto LED with Menu button.
12. Close water supply.
13. Remove orange covering cap from sprinkler head.
14. Art 1559 : close cover and lock.
15. Open water supply. The programmed sector is watered.
The sprinkling sector can only be corrected by reprogramming the complete sector.
2
3

Publicidad

loading

Este manual también es adecuado para:

15598133