How To Install
Getting Started
STEP 1: IDENTIFY GATE PLACEMENT
GATE IS SUITABLE FOR:
TOP OF STAIRS
If installing the gate at the top of stairs, it MUST be
placed on the top landing and only swing away from
the stairs.
BOTTOM OF STAIRS
If installing the gate at the bottom of stairs, we
recommend placing it on the fl oor. If the gate must
be placed on the lowest stair, position it toward the
front of the step.
HALLWAYS AND DOORWAYS
6
STEP 2: ASSEMBLING GATE PANELS
1. Place both hinge panel and catch panel side by side where you intend to install your
gate. This gate fi ts opening 28.5" to 45" (72.4cm to 114cm).
PLEASE NOTE: For correct orientation, make sure the text on the panels is
upright, and the tapered ends of each panel should slope inward.
How To Install
7