4
What's in the Box:
Quick Start Guide (this document)
E-Bike Parts
• 1 × Frame and Rear Wheel
• 1 × Front Wheel
• 1 × Thru-axle
• 1 × Handelbar
• 1 × Saddle and Saddle Pipe
• 2 × Fender
• 1 × Kickstand
Accessories Box
• 5 × Cable Snaps
• 1 × Charger
• 2 × Manual
• 3 × Allen key
• 3 × Open End Wrench
• 1 × Phillips Screwdriver
Accessories Box
(Refer to
1 on page 1)
Bike Parts
(Refer to
2 on page 1)
Bike Frame Number
The bike frame number can be found stamped on the bottom bracket, as
shown in the Figure. It is the unique identifier for your e-bike. When your
bike is stolen, it's the serial number that gives you the biggest chance of
getting it back. It would be a good idea to write it somewhere or take a
picture.
Assembling the E-bike
STEP 1: Install and adjust the handelbar
a. Remove the rubber cap on the top of the stem.
b. Loosen the two screws on the side of the stem and the long screw on
the top of the stem with a 5 mm Allen key, then turn the display 180
degrees, as shown in Figure 1-1 and 1-2.
c. Re-tighten the screws.
d. Put back the rubber cap on the top of the stem.
Figure 1-1
NOTE:
Make sure the torque of the screw on the top is about 4-6 N·m.
Make sure the torque of the ones on the side is about 10-12 N·m.
a. Loosen the four screws on the handlebar clamp in a counterclockwise
direction with a 5 mm Allen key, then remove the screws and front
cover, as shown in Figure 1-3 and 1-4.
b. Place the handlebar in the center of the stem clamp when the user is on
the saddle and make sure it is oriented correctly. The control buttons
on the left. Reinstall the front cover and tighten the screws securely, but
not completely.
c. Push the handlebars left and right to center them; rotate them slightly
so that the brake levers are angled downwards. Then, gradually tighten
the screws in an A-B-C-D sequence, as shown in Figure 1-5.
Figure 1-3
NOTE: Make sure the torque of bolts ABCD is about 6-8 N·m.
STEP 2: Cable management
a. Connect the display sensor cable, as shown in Figure 2-1 and Figure
2-2.
b. Add cable snaps to manage the cables.
。
Figure 1-2
Figure 1-4
A
D
Figure 1-5
C
B