Descargar Imprimir esta página

SPALDING U-Turn SPA0368 Instrucciones De Montaje página 11

Sistema de baloncesto

Publicidad

Idiomas disponibles

Idiomas disponibles

Do not proceed to the next step until concrete is fully cured. Follow directions on pre-mix or concrete packaging regarding
the necessary time required to allow the concrete to fully cure. If using concrete delivered on site professionally, consult your
provider for this necessary information.
Make sure concrete is fully cured prior to clamp removal (step 7).
After concrete cures, remove clamp assembly and lift bottom pole section
7.
(3) from ground sleeve (4) as shown.
STOP!
NOTE
STOP!
11
3
4

Publicidad

loading