Note: Loosen the pre-attached
bolts on the burner
assembly bracket before
performing Step 12.
Step 12
Insert the side burner valve
assembly through the holes in the
side burner front panel, then firmly
seat the valve nozzle into the
burner venturi. Rotate burner valve
assembly counterclockwise to lock
in place with keyholes. Then
tighten pre-attached bolts. Place
the side burner control knob on the
side burner valve stem.
Note: Tighten the bolts on the
burner assembly bracket
securely.
Burner
Assembly
Bracket
Pre-attached Bolts
Step 13
Place the side burner grate onto
the side burner table.
Step 14
Attach side burner igniter lead wire
to the electrode as illustrated.
Warning: Never use your grill
without leak testing all
gas connections and
hoses. See the section
on "Leak Testing" in
this manual for proper
procedures.
27
Side
Burner
Valve
Valve
Nozzle
Bezel
Keyholes
Side Burner
Valve Stem
Burner Venturi
Side Burner
Control Knob
Electrode
Side Burner
Igniter Lead