5
INSTALL WALL MOUNT (ACRYLIC WALL INSTALLATION):
• Slide the MOUNTING PLATE (1) over the
SUPPLY PIPE (2) and secure it to the wooden
cross brace with WOOD SCREWS (3).
Note: wood screws are not included and will
need to be purchased separately.
5b
INSTALL WALL MOUNT (TILED WALL INSTALLATION)
• Push SCREWS (1) through MOUNTING
PLATE (2) and thread on to ANCHORS (3).
• Push ANCHORS (3) through the two holes
that were drilled in step 2.
• With ANCHORS (3) behind the finished
wall, tighten SCREWS (1) to secure
MOUNTING PLATE (2).
Note: Screw holes on the mounting plate
allow for some movement. Using the
leveling bracket before tightening the
screws can help to ensure a more level
install.
1
3
2
3
Exterior
of finished
wall