Descargar Imprimir esta página

Kohler K-7145 Guia De Instalacion página 4

Desagüe de banera
Ocultar thumbs Ver también para K-7145:

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Install the Overflow Ell
Lubricate the two O-rings with the provided grease.
Slide the O-rings into the groove on the overflow ell.
Apply additional grease to the O-rings and surrounding tube.
Slide the overflow tube over the bottom end of the overflow ell.
Attach the gasket to the overflow ell.
Apply a ring of plumbers putty or other sealant to the front side
of the gasket according the manufacturer's instructions.
Align the overflow ell with the overflow hole in the bath.
From inside the bath, thread two screws through the retainer
plate and then into the two lower holes in the overflow ell.
1018842-2-B
Gasket
Overflow Ell
Overflow Tube
4
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-7145-cp