Descargar Imprimir esta página

Kohler K-7145 Guia De Instalacion página 7

Desagüe de banera
Ocultar thumbs Ver también para K-7145:

Publicidad

Idiomas disponibles

Idiomas disponibles

Lift rod
Adjusting
Rail
Adjusting
Screw
Adjusting
Block
Spring
Assemble lift rod
components.
5. Adjust the Lift Rod
NOTE: If more than one lift rod is supplied, choose the one that
most comfortably extends to the length described below.
Assemble the lift rod assembly.
To check for the proper length, place the lift rod assembly on the
top of the closed drain stopper.
Slide the adjusting block up on the adjusting rail to increase
clearance, or down on the rail to decrease the clearance.
Center the eye of the lift rod over one of the top holes in the
overflow ell.
Kohler Co.
Top Holes of
Overflow Elbow
Set proper length for
lift rod assembly.
7
1018842-2-B

Publicidad

loading

Este manual también es adecuado para:

K-7145-cp