AFG PRO 7.2 Ai Manual Del Propietário página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY STEP 2
HARDWARE FOR STEP 2 • PRE-INSTALLED
PART
TYPE
I
BOLT
J
NUT
10
9
DESCRIPTION
QTY
M8X1.25PX25L-15L
M8X1.25P
J
7
8
I
NOTE:
All hardware for this step is pre-installed.
4
Attach FRONT TOP CAP PIECE (10) to side covers.
A
4
NOTE:
This must be assembled before the top handrail.
Attach each TOP HANDRAIL (8) to the INCLINE ARM
B
(7) using the pre-ssembled 4 BOLTS (I) and 4 NUTS (J).
To make assembly easier, lightly tighten all four bolts
to begin, then tighten firmly after all bolts have been
started.
Snap REAR TOP CAP PIECE (9) into FRONT TOP CAP
C
PIECE (10).
11

Publicidad

Tabla de contenido
loading

Tabla de contenido