Descargar Imprimir esta página

cecotec ENERGYSILENCE AERO 5200 LIGHT DESIGN Manual De Instrucciones página 44

Ventilador de techo
Ocultar thumbs Ver también para ENERGYSILENCE AERO 5200 LIGHT DESIGN:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 37
ENGLISH
3. ASSEMBLY
Assembly preparation
-
To prevent personal injury and damage, make sure that the location where the appliance is
going to be installed allows a 2.3-metre clearance from the blades to the floor and a 76-cm
clearance from the blades to any wall or object. Fig. 3
-
Make sure that the building structure can hold the full weight of the fan.
Installation of the mounting bracket
-
Wooden ceiling. Fig. 4
-
Concrete ceiling. Fig. 5
Drill a ⌀8 mm hole in the ceiling and insert the bolt. Align the bracket with the hole and
1.
tighten it with the nut.
Coupling rod assembly. Fig. 6.
2. Align the holes in the coupling rods with the screw holes in the motor. Once installed, be
sure to tighten the screws securely.
Note: tighten the screws a second time.
LED light assembly. Fig. 7
3. Put the two parts of the LED light together as shown in Fig. 7.
Connection of the remote-control receiver. Fig. 8
4. Positioning the receiver: place the motor on the left connection and wire it up. Fig. 9
Blade assembly. Fig. 10
Time saver: blade bolt washers can be installed on each blade prior to installation.
5. Align the holes in the blades with the screw holes in the motor. Once all blades are attached,
tighten all the screws. Before securing screws permanently, repeat with remaining blade
arms.
Note: tighten the blade screws a second time.
44
ENERGYSILENCE AERO 5200 LIGHT DESIGN

Publicidad

loading

Este manual también es adecuado para:

08539