Descargar Imprimir esta página

Bradley LVA Serie Instrucciones De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

LVAD2
Structural Rough-In
Mounting for Standard, ADA, and TAS height shown.
Points A, B, and C require sufficient backing
compliant with local building codes.
WARNING The bracket is not designed to support the
bowl. Wall bracket is a temporary support until
bowl is mounted at location "A". Ensure bowl
is completely seated in the wall bracket and
securely fastened to the wall at point A.
33½"
(851)
31½"
(800)
25¼"
(640)
CODE
A
Install (1) ³⁄₈" wall anchor with a minimum pull-out force of 1,000 lb per local codes at locations shown
B
C
Install wall anchor with a minimum pull-out force of 100 lb per local codes at locations shown
RIM HEIGHT
33½"
30½"
6
Wall Bracket
25" (635)
A
B
C
24¹⁄₈" (612)
27⁵⁄₈" (701)
Provide structural backing compliant with local building codes.
VERTICAL HEIGHT ADJUSTMENTS
No Adjustment
Subtract 3"
6/1/2022
Secure bracket to wall using min. (2) ³⁄₈" anchor bolts to
the left of C/L and min. (2) ³⁄₈" anchor bolts to the right of
C/L. The (2) anchor bolts to the right of C/L must be min.
16" apart from the anchor bolts to the left of C/L. When
mounting is complete, check to ensure the bracket is level.
See Step 1: Bracket Mounting for more information.
36½" (927)
C
L
25" (635)
24¹⁄₈" (612)
DESCRIPTION
Bradley • 215-1850 Rev. G: ECO 22-08-019
A
B
C
27⁵⁄₈" (701)
FIXTURE STYLE
Standard Height, ADA, TAS, and CSA
Juvenile, ADA, and TAS
Installation
(mm)
14¼"
(362)
29⁵⁄₈"
(753)
Bottom
of
¾"
Bracket
(19)
15³⁄₈"
(391)
QTY.
2
2
4

Publicidad

loading

Este manual también es adecuado para:

Verge lvad2