Descargar Imprimir esta página

Hoshizaki Baker GA 950 Manual De Operación, Mantenimiento E Instalación página 9

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 104
Baker GA 950 / GA 550
III. DEFROST WATER
Defrost water and water flushed from the humidifier are led away through a pipe on the rear of the cabinet.
A water seal must be installed between cabinet and drain.
Water Connection
To provide proper steam production, the humidifier must be connected
to a water supply. To assure ideal steam production, it is important that
the electrical conductivity of the inlet water is measured by the installer,
to assure it is within standard range.
Do not use mechanical devices or other means to accelerate the
defrosting process!
No limescale filters, water softeners, ion exchangers
etc. may be used.
EN
ATTENTION
Warning
9

Publicidad

loading

Este manual también es adecuado para:

Baker ga 550