Safety Instructions For Installation - baltur SPARK 18 W Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SAFETY INSTRUCTIONS FOR INSTALLATION

• The equipment must be installed in a suitable area with
adequate ventilation according to the standards and regu-
lations in force.
• The slots of the air extraction grilles and installation room
ventilation openings must not be obstructed even partially.
• In the installation site there must NOT be any risk of explo-
sion and/or fire.
• Thoroughly clean the inside of all pipes of the fuel supply
system before installation.
• Before connecting the burner check that the details on the
plate correspond to those of the utility supplies (electricity,
gas, diesel or other fuel).
• Make sure that the burner is firmly fastened to the heat ge-
nerator according to the manufacturer's instructions.
• Make the connections to the power sources properly as
indicated in the explanatory diagrams and following the
standards and regulations in force at the moment of instal-
lation.
• Check that the fume exhaust system is NOT obstructed.
• If you decide not to use the burner any more, the following
procedures must be performed by qualified technicians:
- Switch off the electrical supply by disconnecting the
power cable from the main switch.
- Cut off the fuel supply using the shut-off valve and
remove the control wheels from their position.
- Render harmless any potentially dangerous parts.
INSTRUCTIONS FOR START-UP, INSPECTION,
USE AND MAINTENANCE
• Start-up, inspection and maintenance of the equipment
must only be carried out by qualified technicians, in com-
pliance with current regulations.
• Once you have fastened the burner to the power generator,
make sure that during testing the flame produced does not
come out of any slots.
• Check for the seal of fuel supply pipes connected to the
equipment.
• Check that the fuel flow rate matches the power required
by the burner.
• Set the burner fuel capacity to the power required by the
heat generator.
• The fuel supply pressure must lie between the values in-
dicated on the data plate located on the burner and/or in
the manual
• The fuel supply system is suitably sized for the flow requi-
red by the thermal module and that it has all the safety and
control devices required by current standards.
• Before starting up the burner, and at least once a year, have
qualified technicians perform the following procedures:
- Set the burner fuel capacity to the power required by
the heat generator.
- Check the combustion adjusting the comburent and/or
fuel air flow to optimise the combustion performance
and emissions according to the regulations in force.
- Check the regulation and safety devices are working
properly.
- Check for the correct operation of the combustion
products exhaust duct.
- Check for the seal of fuel supply pipes in their internal
and external parts.
- At the end of the adjustment procedures, check that all
the mechanical locking devices of regulation systems
are properly tightened.
- Make sure that the burner use and maintenance manual
are available and within your reach.
20 / 56
0006080405_201612

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Spark 18 w dacaSpark 26Spark 26 dacaSpark 26 w l.500Spark 35Spark 35 w

Tabla de contenido